6 3/8-15K Deepwater Riser System (DRS)

The system comprises of the following:

  • A topside package to be located on a rig, including flow head system, service manifold package and HPU.
  • Riser system connected to the flow head and top of the emergency disconnect package.
  • A subsea intervention package that will be connected to the Christmas tree, comprising an Emergency Disconnection Package (EDP), a Lower Riser Package (LRP).

Features

  • Unique design, utilizing metal-to-metal sealing gate valves in the intervention system.
  • Two levels of redundancy for safety.
  • Fitted with an emergency shutdown (ESD) control system.
  • All production bore valves are capable of cutting coil tubing.
  • MUX Control system improving response time in emergency functions.
  • Ability to disconnect EDP at high angle without potential damage.
  • The DRS can disconnect at +/-10°due to an enhanced frame design and the inclusion of a 2” retractable Annulus line stab assembly
  • Removable EDP Re-entry Mandrel
  • Increased coil cutting capability

Industry Standards

NAMEDESCRIPTIONREV
API 6A /ISO 10423Specification for Wellhead and Christmas Tree Equipment (Latest Edition)20th Edition October 2010
API 17D / ISO 13628-4Specification for Subsea Wellhead & Christmas Tree Equipment (Latest Edition)2nd  Edition May 2011
API 17G / ISO 13628-7Petroleum and natural gas industries- Design and operation of Subsea production systems-part 7: Completion / work over riser system2nd Edition July 2006
SAE AS4059Aerospace Fluid Power – Cleanliness Classification for Hydraulic Fluid (Latest Edition)AS4059F September 2013
NACE MR0175 /ISO 15156Petroleum and natural gas industries- Materials for use in H2S-containing environments in oil and gas production2nd  Edition July 2006
DNVGL-OS-E101Offshore standards, Drilling facilitiesJanuary 2018

Operating Specification

PRESSURE CRITERIA SPECIFICATION
Maximum working pressure 15,000 Psi
Maximum Test pressure 25,500 Psi                
TEMPERATURE / DESIGN CRITERIA SPECIFICATION
Temperature Rating P+U
Min. Design Temperature -20° F
Max. Design Temperature 250° F
Nominal bore size 6 3/8”
Drift Dia. 6.34 +.027/-.000
Material Class EE-NL
PSL Level PSL-3G
PR Level 2
OPERATING CRITERIA SPECIFICATION
Water depth 10,000 FT (Based upon loading)
Service Condition H2S per NACE MR 01-75
API Monogram No

Emergency Disconnect Package(EDP)


The Emergency Disconnect Package (EDP) forms part of the well intervention package, which will be, used during well intervention operations from a DP or anchored Rig. The EDP is designed to allow disconnection of the riser system from the LRP assembly in the event of weather dictated disconnect, routine operational requirements or vessel induced drive off/ drift off situations.

Lower Riser Package(LRP)



The Lower Riser Package (LRP) forms part of an Intervention Package. This equipment is designed to land out and lock onto a Subsea Production Tree and has surface-controlled gate valves to close in the well during intervention operations.

Search our Product Database:
Scroll to Top