Our Core Policies
Home » Our Core Policies

Quality
All our activities are driven by one goal: providing products and services that meet the customer’s needs and create value
At WOM, we set the standards in quality by having well-trained, enthusiastic employees who effectively implement this management system. This philosophy creates gainful work for our employees and profit for our stakeholders.
Our focus is to:
- Operate in a safe, consistent and economical manner
- Maintain conformity to the documented quality management system, including the applicable industry codes, standards and/or specifications and customer-specified requirements
- Maintain compliance to statutory and regulatory requirements
- Prevent nonconformities at all stages of design and manufacturing by implementing the requirements of this manual and supporting procedures
- Ensure customer satisfaction
- Foster an environment of continual improvement
- Communicate this policy throughout Worldwide Oilfield Machine, Inc. and ensure that it is understood
- Aggressively pursue the Mitigation of Systemic Risk™ through the implementation of this management system
Monitor and periodically review the management system, including stated objectives, and this policy for suitability and effectiveness
Certificates
- All
- WOM Asia Pacific
- WOM India
- WOM ME
- WOM UK
- WOM USA-Canemont
- WOM USA-Cunningham
- WOM USA-Fairmont
- All
- WOM Asia Pacific
- WOM India
- WOM ME
- WOM UK
- WOM USA-Canemont
- WOM USA-Cunningham
- WOM USA-Fairmont
Patents
This section provides patent information about selected WOM products. This is not intended to provide legal advice and should not be used for any purpose other than determining whether WOM has elected to mark selected products with selected patent information.
WOM PATENTS & Applications
Updated: May 11, 2020
Patent List-Pending
- WOM-52: Provisional Patent Application No. 62/979,030—TOP ENTRY BALL VALVE
- WOM-51: Provisional Patent Applications No. 62/981,165 & No. 62/961,452—SP GATE VALVE
- WOM-50: Provisional Patent Application No. 62/957,561— VARIABLE BORE RAM ASSEMBLY
- WOM-49: Provisional Patent Application No. 62/941,246— INTERLOCKING DUAL V-SHAPED SHEAR RAM ASSEMBLY AND METHOD
- WOM-48: Patent Application No. 16/831,188—DEEPWATER RISER INTERVENTION SYSTEM
- WOM-47-PCT: PCT Application No. PCT/US20/22938—ANNULAR PREVENTER
- WOM-46: Patent Application No. 16/249,216—PRESSURE GAUGE FLANGE ASSEMBLY
- WOM-45: Patent Application No. 16/246,834– DUAL COMPACT CUTTING DEVICE INTERVENTION SYSTEM
- WOM-42: Patent Application No. 16/259,081– LOCKING MECHANISM FOR SUBSEA COMPACT CUTTING DEVICE (CCD)
- WOM-41: Design Patent Application No. 29/626364– Packer Design
- WOM-40- PCT: PCT Application PCT/US18/65147– REPLACEABLE SEAT SEAL ASSEMBLY
- WOM-40- CIP: Patent Application No. 16/288,497– SINGLE-PIECE REPLACEABLE SEAT SEAL ASSEMBLY
- WOM-40: Patent Application No. 15/909,307– REPLACEABLE SEAT SEAL ASSEMBLY
- WOM-35: CON: Patent Application No. 16/190,665– BOP Booster Piston Assembly and Method
Patent List-Granted
- WOM-39: US 10,663,068– WEDGE GUIDE
- WOM-38- DIV: US 10,570,690– BOP Compact Bonnet-Booster Piston Assembly and Method
- WOM-38: US 10,378,301– BOP Compact Bonnet-Booster Piston Assembly and Method
- WOM-37-CON: US 10,473,234– PLUNGER GEAR SHAFT ASSEMBLY FOR TORQUE REDUCER FOR HIGH-PRESSURE GATE VALVES
- WOM-37: US 10,060,548—Torque Reducer for High-Pressure Gate Valves
- WOM-35: US 10,190,382– BOP Booster Piston Assembly and Method
- WOM-31-CIP: US 10,655,421– Compact Cutting Device
- WOM-31-CON: US 10,316,608– Compact Cutting Device
- WOM-31: US 9,732,576– Compact Cutting Device
- WOM-30: US 10,030,784– Ball Valve Tertiary Seal Assembly
- WOM-21-CON: US 9,010,727– Valve Seat Assembly for Rotary Valve and Method (Split Block Valve)
- WOM-21: US 8,490,949 – Valve Seat Assembly for Rotary Valve and Method (Split Block)
- WOM-19: US 8,205,890 – Resilient High-Pressure Metal-to-Metal Seal and Method
- WOM-16: US 6,966,537 – Valve with Seat Assembly
- WOM-15-CON: US 10,006,266– Lightweight and Compact Subsea Intervention Package and method
- WOM-15-DIV: US 8,714,263 — Lightweight and Compact Subsea Intervention Package and Method
- WOM-15: US 7,578,349 – Lightweight and Compact Subsea Intervention Package and Method
- WOM-13: US 7,040,408 – Flowhead and Method
- WOM-12: US 6,601,650 – Method and Apparatus for Replacing BOP with Gate Valve
- WOM-11: US 6,575,426 – Valve System and Method
- WOM-9-CON: US 6,684,897 – Valve Actuator and Method
- WOM-9: US 6,609,533 – Valve Actuator and Method
- WOM-5: US 6,279,875 – Gate Valve with Improved Seat Assembly
- WOM-4: US 6,260,822 – Seat Assembly for a Gate Valve
- Magnum-001: US 8,672,038 — Retrievable Subsea Bridge Tree Assembly and Method
- Magnum-004: US 8,806,769 — Bullseye Indicator and Method

Environment
Effective management of the health, safety and welfare of our workforce and the protection of the environment are key aspects of WOM’s business goals
Worldwide Oilfield Machine (WOM) is committed to protecting the environment by minimizing environmental impacts of our operations. This commitment extends to our staff, our customers, and the community in which we operate.
To minimize environmental pollution from our activities, products, and services, we pledge to:
- Comply with all applicable environmental regulations
- Engage in sound reuse and recycling practices and explore feasible opportunities to minimize the amount of waste generated
- Use energy efficiently throughout our operations
- Train all of our staff on environmental programs and empower them to contribute and participate
- Continually improve over time by striving to measure our environmental impacts and by setting goals to reduce these impacts each year

Health & Safety
Life comes first. Always.
We are committed to providing a safe and healthy workplace for our employees, customers and visitors while managing out operations in a responsible manner.
We strive to improve our health and safety performance continuously by:
- Developing and improving programs and procedures to ensure compliance with all applicable laws and regulations
- Ensuring that personnel are properly trained in safe work procedures
- Taking appropriate action to minimize hazards or change conditions that endanger health and safety
- Considering occupational health and safety factors in all operating decisions, including those related to planning and expansion
- Encouraging personal accountability, emphasizing compliance with WOM policies and best practices during employee training and in performance reviews

Commitment to Customer Service
Satisfying customer needs is top priority at WOM.
Whether there is a technical or an operational question, custom design requirement or call to service equipment’s in the field, WOM Engineering and Service Centers are strategically located worldwide to support your operations.
- With one of the largest inventories of replacement parts available, spares can be rapidly shipped to where they may be needed.
- Factory-trained technicians, deployed from WOM Service Centers, also perform comprehensive site assessments, reconditioning and upgrading of existing equipment.
- Recognizing the mission-critical nature of our customers’ operations, world-class WOM service facilities and highly trained, experienced service technicians are available 24/7 to support WOM equipment and systems in the field.