WOM’s Pipe Line End Manifolds (PLEM’s) and Pipe Line End Terminations (PLET’s) utilize Magnum Dual Block Valves (ROV Operated) and Magnum Subsea Gate Valves. PLET’s come with standard interfaces such as swivel flange, gooseneck or straight header per client’s specification
PLET
The Pipe Line End Termination (PLET) is a termination structure between the main pipeline and a rigid spool jumper or / flexible hose. The PLET consist of ROV operated Isolation WOM Single or Dual Gate Valves and hubs. It is installed within the pipeline by horizontal or vertical direction due to the first end or second installation. The standard interface such as swivel flange and Gooseneck or straight header provided to meet client’s specification.
PLEM
The Pipe Line End Manifold (PLEM) is a subsea structure acts as a connection point between the main or branch pipeline. The PLEM consist of WOM Dual Block Valves (ROV Operated), Gate Valves, Tees and hubs. PLEM has facilities for Multiphase Flowmeter, pig launching and/or receiving. The standard interface and components such as hubs and flange outlets are provided for production and well service line to meet client’s specific requirements. The PLEM vary in size and complexity and can include a greater variety of features and facilities
Specification and Features
Custom Engineering: PLEM’s have facilities for multiphase flowmeters and pig launching and/or receiving equipment. The standard interface and components such as hubs and flange outlets are provided for oil & gas production and well service lines to meet client’s specific requirements. PLEM’s vary in size and complexity and can include a variety of features and facilities
Flexible Design: PLET’s come with standard interfaces such as swivel flange, gooseneck or straight header per client’s specification
Applications
All PLEM’s and PLET’s are custom-manufactured to meet customer’s specific application.
DOF Group-Galoc Project
WOM AP (formerly known as Magnum Subsea Systems) successfully completed and delivered subsea production equipment to DOF Group. The
equipment was custom-designed for the Galoc Phase II project taking place in the South China Sea, south of Manila in the Philippines at 290 meters (951ft) below sea.
The subsea equipment consists of a pipeline end termination (PLET), jumper spools with flow-line connectors,a gooseneck connector and a subsea riser base installed by the DOF construction vessel. The construction vessel completed the installation activities and connected two wells into the floating production, storage and offloading (FPSO) vessel, Rubicon Intrepid, in December 2013